Construction schedule
1.
Aluminum formwork construction period is short,high reuse rate,and has the advantages of convenient assembly,wide range of applications,can be completely assembled by manual,after short-term training workers,can be installed about 30 square meters everyday,3-4 days to complete a layer of a structural layer.
It takes 5-6 days to pour a layer of traditional wood formwork. Aluminum formwork is suitable for all kinds of wall, horizontal floor, etc., even the secondary structure and special-shaped components can be synchronized construction, construction progress is greatly accelerated, the time cost is greatly reduced
2."Aluminum formwork + Self-climbing platform" during construction, in the site of temporary power failure, rain and other circumstances, aluminum formwork can also be normal construction, without any danger of electric shock. At the same time, the digital control of the attachment type lifting scaffolding, so that the "lifting" procedure does not affect the construction of various types of work, in a way, the construction progress is not affected by the outside world. The wooden formwork are assembled in the field and transported to the warehouse surface by tower crane. In the face of rain, fog and other bad weather, the construction of special equipment is prohibited, so that the construction progress will also be affected.
Compare construction quality of wood formwork with aluminum formwork
1, the traditional deviation value of wood formowork is more than 10 mm, easy to deformation, especially the outer column, wood formwork reinforcement point is wide, and easy to "run", need to have a technical level of pure wood formwork workers.
2. Because the wood formwork is poorly made and the number of times of use reaches more than 3 times because the joint has cement and sand, etc., it often needs to be corrected. Deformation and expansion are easy to occur after water absorption, and the accuracy cannot be achieved, at least beyond the deviation of 15mm.
3. In contrast, the aluminum formwork component size deviation value is between millimeters, the root positioning of the aluminum formwork column is fixed by welding, the verticality of the laser instrument, accurate to 5mm, the junction of the upper and lower layer has a concrete fixed shared module, not easy to wrong platform; And in the process of casting, if the reinforcement is not in place, it is easy to "run the mold", resulting in the wrong platform.
Construction safety
1.The traditional wood formwork is composed of scattered wood beam and formwork, which requires a formwork and a wooden beam for traditional assembly. It is supported by steel pipe fasteners and U head, so the operation is not flexible enough. Materials need to be lifted by tower crane, and must be started with electricity. There may be cases of illegal operation and injury.
2.The traditional outer frame is generally from the ground, using cantilever beams and wire rope stay cable reinforcement. And the Self-climbing platform (SCP) each plate operation frame is covered with protective panels, so that layers of protection, climbing lifting process by computer control.
3.civilized construction, all parts of the aluminum formwork system can be reused 150-300 times. With the rise of the floor, the attached lifting scaffold rises synchronously and is used in combination with the aluminum formwork. No need to replace the structure and standard protection
KITSEN aluminum formwork can be used together with the self-climbing platform. The SCP can improve the performance not only to bring convenience to the construction of aluminum formwork, but also to provide a safety guarantee for the installation personnel. In addition, the aluminum formwork components smooth and clean, plastering area reduced, small vertical deviation, low utilization rate of auxiliary materials, supporting work cost less, etc. represent the super "long" play of aluminum formwork, these advantages can save a lot of equipment rental costs and material turnover costs for the project.